热门标签

足球投注网:Fukushima debris removal delayed by another year

时间:1个月前   阅读:4

足球投注网www.hg108.vip)是皇冠体育官网线上直营平台。足球投注网面向亚太地区招募代理,开放皇冠信用网代理申请、皇冠现金网代理会员开户、皇冠足球投注等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

Telegram中文搜索引擎www.tel8.vip)是一个Telegram群组分享平台,Telegram中文搜索引擎包括Telegram中文搜索引擎、Telegram群组索引、Telegram群组导航、新加坡Telegram群组、Telegram中文群组、Telegram群组(其他)、Telegram 美国 群组、Telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram中文搜索引擎为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:足球分析专家:Bursa rises cautiously ahead of Jackson Hole meet

下一篇:Former UK ambassador to Myanmar detained in Yangon

网友评论